Client: WFS
Type of construction works: WFS PHARMA - Creation of a cold room for a pharmaceutical warehouse - ROISSY CDG Freight Terminal
Description of the works:
- Installation of a constant 15-25° heat treatment system in a 2,400 m2 temperature-controlled building
- Creation of three cold rooms: +15-+25°C zone / +2-+8°C zone / -20°C freezing zone
- + Two temperature-controlled zones at +2 to +25°C for aerial containers waiting to be loaded
Delivery date: September 2019
Cost of the works: €900,000